...

AUB – Ada Doge Hall

Student Hub Renovation & High-Traffic Infrastructure

The Challenge

Ada Dodge Hall serves as a central hub for student life, housing dining services and activity spaces. The university needed a complete interior strip-out and structural remodel to expand seating capacity and modernize the culinary facilities, all while minimizing disruption to daily campus life on a highly congested campus.

Our Approach

  • Phased Fast-Track Construction: Executed the heavy demolition and structural reinforcement during the brief summer break, utilizing double-shift scheduling to compress the timeline.
  • Commercial Kitchen Integration: Installed advanced ventilation, grease traps, and industrial-grade plumbing to support a multi-vendor, high-volume student cafeteria.
  • Sustainable Design: Implemented smart LED lighting arrays and high-durability, recycled terrazzo flooring designed to withstand foot traffic from thousands of students daily.

The Outcome

Delivered the project two weeks ahead of the fall semester deadline, resulting in a 40% increase in student seating capacity and a modern, energy-efficient dining facility.

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.